Snap a receipt in the field. Buildero reads it and files a categorized expense on the right project, no re-keying. Because costs link to the job, the profit per job is a number you can read.
Receipt to expense to profit
Photographed
FERGUSON PLUMBING
07 / 08 / 26
PEX-A 1/2 in x 100 ft112.40
Push-fit fittings, box68.75
Brass ball valve, 3/4 in41.20
Pipe insulation, 6 pk38.90
TOTAL$261.25
→becomes
Filed expense
Vendor
Ferguson Plumbing Supply
Category
Materials, plumbing
Project
Elm St. addition
Status
Filed to the project
Amount
$261.25
Profit, per job
Elm St. addition
Contract to date
$52,400
Costs posted
$38,910
This receipt
+$261.25
25.7% margin
25.7%
Profit, so far$13,490
From the field to the job cost.
Photograph a receipt and it becomes a categorized expense on the correct project.
Field crews can submit receipts from a phone; no desk trip required.
Expenses, invoices, and hours all link through the project.
The finances view reads profit per job, with a CSV or Excel export when you need it.
File your next receipt in seconds.
Photograph a receipt and see it land on the right job, with the margin updated.